top of page

Krasnopolska

apartment buildings

  • Authors: Tomáš Bindr, Petr Doležal

    Projection: Radomír Pauler

    Status: realizace

    Project year: 2018

    Area: 1104 m2

The boundaries of two socio-ecotones. 

A distinct terrain depression between the development of family houses and the technological park of the...

Residential buildings, we think, are a fine transitional element.

The ZPD does not work with the concept of transition, it only knows the sharp boundaries. And so, in the eyes of the concerned binding and active "permitters" we become unwanted, suffered and only conditionally allowed in the area of family housing. We keep the maximum storey and roof pitches of attics, per centimetre mutual spacing, per square decimetre maximum built-up area of one building and per square metre total built-up area...

  • Photography: Roman Polášek

    Structural engineering: Ing. Michal Janík, Statika Janík 

    VHC: Ing. Lukáš Onderka, ATELIER 38 

    Gas engineering: Ing. Martin Vavrica, Projekt 2010

    Fire-resistance engineering: Ing. Václav Galas, Ing. Petr Matějek 

    Low-voltage engineering: Jarmila Mazurová 

    VH objekty: Ing. Iva Výtisková, Ing. Bernard Hajovský, Projekt 2010 

    Traffic engineering: Ing. Jan Ludvík, Projekt 2010

  • Stavba Moravskoslezského kraje

    čestné uznání

bottom of page